In the method of stitching, it is a normal practice to construct the widening part of thebridge at first and let it stay undisturbed for several months.
After that, concreting will thenbe carried out for the stitch between the existing deck and the new deck.
In this way, thedead load of the widened part of bridge is supported by itself and loads arising from thenewly constructed deck will not be transferred to the existing deck which is not designed t