Thread Reply

ferraro rogers
2018-09-26 07:27:47

Basically, piers constructed monolithically with the bridge deck are advantageous in the following ways: (i) Movement of the bridge deck is achieved by the bending deformation of long and 9 slender piers.
In this way, it saves the construction cost of bearings by using monolithic construction between bridge deck and piers.
Moreover, it is not necessary to spend extra effort to design for drainage details and access for bearing replacement.
On the oth

Leave an Answer

: Login to reply
DMCA.com Protection Status